<tbody id="rgqku"></tbody>
<button id="rgqku"><object id="rgqku"><listing id="rgqku"></listing></object></button>

      1. <button id="rgqku"><samp id="rgqku"></samp></button>

        <form id="rgqku"><tr id="rgqku"></tr></form>
        <dd id="rgqku"><noscript id="rgqku"></noscript></dd>

      2. <rp id="rgqku"></rp>
      3. <th id="rgqku"></th>
              1. <em id="rgqku"></em><span id="rgqku"><pre id="rgqku"></pre></span>

                中文版 | English
                Home About Us Products Video News Jobs Feekback Contact Us
                Cutting machine
                Edge grinding machine
                Chamfering machine
                Burr-removal machine
                Pin machine
                Ring machine
                Four-axies plate drilling machine
                V-cut machine
                X-ray inspetion machine
                Punch oven
                PCB machining tool series
                Others
                hole machine
                automatic high speed unreeling device

                Dongguan XinYao Machinery Co.,Ltd

                Contact: Mr Liao
                Phone: +86-15812813611
                Tel: +86-0769-81505183
                Fax:+86-0769-82387366

                QQ: 305808446
                Website:
                www.zjxiangsen.com

                News Your Present Position:Home >> News
                Vcut machine operation flow
                Data: 2012-8-6      Hit: 6899


                1. Before starting the machine on, make sure the cutter, nut and screws are tightly firm, these tools must be tightened on time if any loosen problem found.
                2. Mind the direction of cutting when installing the cutter, no reversing.
                3. Main cutter is in clockwise.
                4. Before V cutting, pneumatic device must be on and keep work piece tighten on the worktable and close to the positioning plate, hands out cutters.
                5. Any problem with the machine, immediately cut off the power to stop operations and put into repair asap, the machine is not allowed to run with any problem.
                6. Before cutting, make sure there are no any pitons or sand particles on the cutter to keep people from being hurt when cutters working..
                7. The power must be off when the machine cleaned, lubricated or cutter changed.
                8. The machine can only be operated, adjusted and maintained by designated professionals.
                9. Workers should wear ear plug and goggle when operating..
                10. The maintenance of the machine should be in accordance with 《Equipment operation, maintenance system》.

                Copyright Dongguan Xinyao Machinery Co.,Ltd all right reserved. Admin.
                Tel: +86-0769-81505183 (Mr. Liao)  Fax: +86-0769-82387366  Web: www.zjxiangsen.com             粵ICP備16101055號
                Address: No.5 Maoshandong road, Xiagang village, Changan town, Dongguan city, Guangdong province, China.

                <tbody id="rgqku"></tbody>
                <button id="rgqku"><object id="rgqku"><listing id="rgqku"></listing></object></button>

                    1. <button id="rgqku"><samp id="rgqku"></samp></button>

                      <form id="rgqku"><tr id="rgqku"></tr></form>
                      <dd id="rgqku"><noscript id="rgqku"></noscript></dd>

                    2. <rp id="rgqku"></rp>
                    3. <th id="rgqku"></th>
                            1. <em id="rgqku"></em><span id="rgqku"><pre id="rgqku"></pre></span>

                              18禁止免费观看试看免费大片_japanese丰满成熟35-55_闷骚的老熟女人15p_三级4级全黄